Skip to content

Profesional Roof Replacement

5-STAR CLEANUP, Certified Roofing contractor, 2 Year Workmanship Warranty, And Hundreds Of Happy Clients

Asphalt Roofs

Metal Roofs

Roll Roofing Roofs

TPO Roofs

Wood Shake Roofs

What we offer in our

Roofing replacement service

Remove all layers of old shingles, underlayment, and nails.

Dispose of debris in our dump trailer.

Thoroughly clean the yard, using magnets to pick up any nails.

Our crew foremen will check each plywood piece for damage and proper nailing.

Apply ice and water shield to all eaves and valleys.

Cover the entire roof with synthetic underlayment.

Install 30 years architectural shingles

Install drip edge along all roof edges.

Place a starter strip on the leading edges of the roof.

Install ridge vents or turtle vents for proper attic ventilation.

Add flashing where needed on the roof.

Install new flashing on pipes.

Complete the job by installing ridge cap on the roof.

2 Year Labor Warranty

Utah’s 24/7

Roof Replacement ?

At Good Neighbor Roofing, we specialize in roof replacements, a procedure involving the removal of an old roof and the installation of a brand-new one.

This becomes essential when a roof is too damaged to repair or when homeowners desire an upgrade to a different roofing material. We’re here to help you with seamless and efficient roof replacement services tailored to your needs.

Our Customers

Say It Best

Benefits of starting your

Roof Replacement

Enhanced Protection: A new roof replacement means a fresh underlayment, providing better protection against water damage and leaks.

Durability Boost: Installing a new ice and water shield in all eaves, valleys, sidewalls, and necessary areas ensures increased durability against various weather conditions.

Plywood Inspection: Our process involves checking the actual plywood, identifying and replacing any rotten or damaged pieces to fortify the roof structure.

Uncovering Flaws: During the roof replacement, we uncover and address any flaws or issues left behind by previous installations, ensuring a more robust and secure roofing system.

roof replacement
Utah roofing

Products we install

Wood Shakes

Synthetic underlayment’s

Ice and water shield

Attic ventilation

Sky lights

Local Roof Replacement Experts

Asphalt roofs

Metal Roofs

Roll Roofing Roofs

Flat Roofs

TPO Roofings

Some Of Our

Roof Replacements

Some Of Our

Frequently Asked Questions

What steps are involved in a roof replacement process?
  1. Initial Assessment: The process begins with a thorough evaluation of your current roof’s condition. This includes inspecting for signs of damage, leaks, and overall wear and tear.
  2. Planning and Materials Selection: After the assessment, a plan is devised for the replacement. This involves choosing appropriate roofing materials based on factors like durability, style, and budget.
  3. Old Roof Removal: The existing roofing materials, including shingles, underlayment, and flashing, are carefully removed. This step exposes the underlying structure for inspection.
  4. Structural Inspection and Repair: The exposed roof structure is thoroughly examined for any signs of damage, rot, or deterioration. Any necessary repairs are carried out to ensure a solid foundation.
  5. Installation of Underlayment: A new underlayment is placed over the repaired roof structure. This is a protective barrier that adds an extra layer of waterproofing.
  6. Roofing Material Installation: The selected roofing materials, such as shingles or tiles, are meticulously installed according to manufacturer guidelines. This includes ensuring proper alignment, fastening, and sealing.
  7. Flashing and Ventilation: Flashing is placed around roof features like chimneys and walls to prevent water infiltration. Adequate ventilation measures are also incorporated to maintain air circulation.
  8. Final Touches: The last steps involve ensuring all components are securely in place. Gutter systems, if applicable, might also be checked or installed at this point.
How long do roofing projects take

We aim for speedy, thorough roofing. Time varies by material, size, and pitch. Average 3000 sq.ft.: 1-2 days. Larger 4000-6000 sq.ft.: 3-4 days.

Is Good Neighbor Roofing insured?

We follow state and industry rules, fully insured for all projects we undertake.

How much does a roof replacement cost?

The cost varies based on factors like the size of your roof, chosen materials, and any additional repairs needed. We provide customized quotes for each project.

Call now to schedule a roof

Inspection and get your free quote today!

2 year labor Warranty

We accept ALL insurances

20yrs Combined Experience

Immediate Response- 24/7